Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Plastics product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

913

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $921k 130k
MMBtu
$8.59
- Electrical $614k 11,307k
kWh
$0.065
- Natural Gas $85k 13k
MMBtu
$6.51

7,456

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 13k
MMBtu
10.1%
- Electrical $79k 1,279k
kWh
11.3%
- Natural Gas $6.1k -
MMBtu
-
Waste $3.2k
Productivity/Other $33k
TOTAL $146k
*May be negative reflecting an increased cost component required to save energy and costs overall

851

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $922k 132k
MMBtu
$8.45
- Electrical $611k 11,429k
kWh
$0.065
- Natural Gas $89k 14k
MMBtu
$6.47

3,215

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $41k 5.0k
MMBtu
3.8%
- Electrical $28k 491k
kWh
4.3%
- Natural Gas $4.0k -
MMBtu
-
Waste $2.1k
Productivity/Other $13k
TOTAL $56k