ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Photographic film, paper, plate, and chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,011k 331k
MMBtu
$7.86
- Electrical $906k 21,869k
kWh
$0.051
- Natural Gas $345k 63k
MMBtu
$6.20

79

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $126k 14k
MMBtu
4.3%
- Electrical $65k 1,399k
kWh
6.4%
- Natural Gas $38k -
MMBtu
-
Waste $0.5k
Productivity/Other $15k
TOTAL $142k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,011k 331k
MMBtu
$7.86
- Electrical $906k 21,869k
kWh
$0.051
- Natural Gas $345k 63k
MMBtu
$6.20

39

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $65k 6.7k
MMBtu
2.0%
- Electrical $33k 657k
kWh
3.0%
- Natural Gas $18k -
MMBtu
-
Waste -
Productivity/Other $14k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall