ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Custom compounding of purchased resins
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $955k 129k
MMBtu
$8.13
- Electrical $651k 11,847k
kWh
$0.061
- Natural Gas $55k 7.0k
MMBtu
$6.16

190

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 7.9k
MMBtu
6.1%
- Electrical $40k 771k
kWh
6.5%
- Natural Gas $14k -
MMBtu
-
Waste $6.1k
Productivity/Other $47k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $858k 124k
MMBtu
$7.82
- Electrical $613k 11,642k
kWh
$0.059
- Natural Gas $44k 4.8k
MMBtu
$6.49

80

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.4k
MMBtu
2.7%
- Electrical $14k 328k
kWh
2.8%
- Natural Gas $7.5k -
MMBtu
-
Waste $0.7k
Productivity/Other $20k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall