The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 325991 Custom compounding of purchased resins

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $955k 129k
MMBtu
$8.13
- Electrical $651k 11,847k
kWh
$0.061
- Natural Gas $55k 7.0k
MMBtu
$6.16

190

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 7.9k
MMBtu
6.1%
- Electrical $40k 771k
kWh
6.5%
- Natural Gas $14k -
MMBtu
-
Waste $6.1k
Productivity/Other $47k
TOTAL $126k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $858k 124k
MMBtu
$7.82
- Electrical $613k 11,642k
kWh
$0.059
- Natural Gas $44k 4.8k
MMBtu
$6.49

80

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 3.4k
MMBtu
2.7%
- Electrical $14k 328k
kWh
2.8%
- Natural Gas $7.5k -
MMBtu
-
Waste $0.7k
Productivity/Other $20k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall