ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Printing ink manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $399k 45k
MMBtu
$9.77
- Electrical $190k 3,207k
kWh
$0.076
- Natural Gas $81k 12k
MMBtu
$7.40

49

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 5.0k
MMBtu
11.2%
- Electrical $35k 492k
kWh
15.4%
- Natural Gas $3.9k -
MMBtu
-
Waste $13k
Productivity/Other $0.5k
TOTAL $59k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $399k 45k
MMBtu
$9.77
- Electrical $190k 3,207k
kWh
$0.076
- Natural Gas $81k 12k
MMBtu
$7.40

21

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $8.7k 0.9k
MMBtu
2.0%
- Electrical $5.8k 87k
kWh
2.7%
- Natural Gas $1.5k -
MMBtu
-
Waste $13k
Productivity/Other ($-0.4)k
TOTAL $22k
*May be negative reflecting an increased cost component required to save energy and costs overall