ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other chemical product and preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

116

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,575k 257k
MMBtu
$8.90
- Electrical $660k 12,698k
kWh
$0.069
- Natural Gas $624k 116k
MMBtu
$6.29

955

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $199k 19k
MMBtu
7.3%
- Electrical $114k 1,830k
kWh
14.4%
- Natural Gas $36k -
MMBtu
-
Waste $11k
Productivity/Other $16k
TOTAL $226k
*May be negative reflecting an increased cost component required to save energy and costs overall

111

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,587k 260k
MMBtu
$8.87
- Electrical $669k 12,979k
kWh
$0.068
- Natural Gas $627k 116k
MMBtu
$6.16

424

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 4.1k
MMBtu
1.6%
- Electrical $24k 397k
kWh
3.1%
- Natural Gas $48k -
MMBtu
-
Waste $1.8k
Productivity/Other $9.5k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall