ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other chemical product and preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

114

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,578k 257k
MMBtu
$8.86
- Electrical $666k 12,859k
kWh
$0.068
- Natural Gas $616k 114k
MMBtu
$6.17

938

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $199k 19k
MMBtu
7.4%
- Electrical $114k 1,842k
kWh
14.3%
- Natural Gas $36k -
MMBtu
-
Waste $11k
Productivity/Other $15k
TOTAL $225k
*May be negative reflecting an increased cost component required to save energy and costs overall

104

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,540k 251k
MMBtu
$8.63
- Electrical $653k 13,158k
kWh
$0.066
- Natural Gas $600k 104k
MMBtu
$6.14

394

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $83k 4.3k
MMBtu
1.7%
- Electrical $24k 415k
kWh
3.2%
- Natural Gas $51k -
MMBtu
-
Waste $1.9k
Productivity/Other $10k
TOTAL $95k
*May be negative reflecting an increased cost component required to save energy and costs overall