ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Toilet preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $692k 87k
MMBtu
$9.59
- Electrical $388k 6,171k
kWh
$0.068
- Natural Gas $147k 23k
MMBtu
$6.22

249

Recommendations

8.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $128k 14k
MMBtu
15.9%
- Electrical $89k 1,341k
kWh
21.7%
- Natural Gas $16k -
MMBtu
-
Waste $1.6k
Productivity/Other $9.4k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $703k 90k
MMBtu
$9.52
- Electrical $391k 6,450k
kWh
$0.066
- Natural Gas $145k 24k
MMBtu
$6.26

98

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 5.0k
MMBtu
5.5%
- Electrical $29k 483k
kWh
7.5%
- Natural Gas $6.1k -
MMBtu
-
Waste $0.2k
Productivity/Other $3.7k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall