ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Toilet preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $703k 90k
MMBtu
$9.52
- Electrical $391k 6,450k
kWh
$0.066
- Natural Gas $145k 24k
MMBtu
$6.26

225

Recommendations

8.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $128k 14k
MMBtu
15.5%
- Electrical $89k 1,364k
kWh
21.1%
- Natural Gas $16k -
MMBtu
-
Waste $1.8k
Productivity/Other $10k
TOTAL $140k
*May be negative reflecting an increased cost component required to save energy and costs overall

24

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $650k 84k
MMBtu
$9.55
- Electrical $363k 6,006k
kWh
$0.067
- Natural Gas $149k 23k
MMBtu
$6.67

96

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 5.2k
MMBtu
6.2%
- Electrical $31k 511k
kWh
8.5%
- Natural Gas $6.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $4.0k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall