ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soap and other detergent manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

26

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $759k 101k
MMBtu
$9.29
- Electrical $332k 5,588k
kWh
$0.077
- Natural Gas $307k 44k
MMBtu
$6.77

211

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $132k 19k
MMBtu
18.3%
- Electrical $93k 1,805k
kWh
32.3%
- Natural Gas $29k -
MMBtu
-
Waste $2.2k
Productivity/Other $4.6k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

26

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $759k 101k
MMBtu
$9.29
- Electrical $332k 5,588k
kWh
$0.077
- Natural Gas $307k 44k
MMBtu
$6.77

110

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $47k 3.0k
MMBtu
3.0%
- Electrical $22k 292k
kWh
5.2%
- Natural Gas $19k -
MMBtu
-
Waste $0.2k
Productivity/Other $3.8k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall