ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soap and other detergent manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

30

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $845k 118k
MMBtu
$9.09
- Electrical $373k 6,956k
kWh
$0.075
- Natural Gas $314k 47k
MMBtu
$6.54

241

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $129k 18k
MMBtu
15.1%
- Electrical $91k 1,744k
kWh
25.1%
- Natural Gas $27k -
MMBtu
-
Waste $16k
Productivity/Other $3.2k
TOTAL $148k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $758k 101k
MMBtu
$9.20
- Electrical $330k 5,515k
kWh
$0.077
- Natural Gas $309k 45k
MMBtu
$6.71

116

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $45k 2.9k
MMBtu
2.9%
- Electrical $22k 283k
kWh
5.1%
- Natural Gas $18k -
MMBtu
-
Waste $0.2k
Productivity/Other $3.6k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall