ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Soap, cleaning compound, and toilet preparation manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

78

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $887k 912k
MMBtu
$8.89
- Electrical $392k 7,487k
kWh
$0.071
- Natural Gas $338k 835k
MMBtu
$6.48

629

Recommendations

8.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $145k 16k
MMBtu
1.8%
- Electrical $92k 1,575k
kWh
21.0%
- Natural Gas $39k -
MMBtu
-
Waste $12k
Productivity/Other $13k
TOTAL $169k
*May be negative reflecting an increased cost component required to save energy and costs overall

71

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $802k 976k
MMBtu
$8.91
- Electrical $367k 6,812k
kWh
$0.072
- Natural Gas $306k 906k
MMBtu
$6.63

277

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 5.9k
MMBtu
0.6%
- Electrical $36k 576k
kWh
8.4%
- Natural Gas $28k -
MMBtu
-
Waste $0.4k
Productivity/Other $3.0k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall