ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Adhesive manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

37

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $409k 45k
MMBtu
$9.94
- Electrical $221k 3,077k
kWh
$0.077
- Natural Gas $106k 14k
MMBtu
$6.73

303

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 4.4k
MMBtu
9.6%
- Electrical $34k 427k
kWh
13.9%
- Natural Gas $13k -
MMBtu
-
Waste $6.7k
Productivity/Other $4.1k
TOTAL $69k
*May be negative reflecting an increased cost component required to save energy and costs overall

32

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $421k 46k
MMBtu
$9.90
- Electrical $229k 3,097k
kWh
$0.080
- Natural Gas $112k 14k
MMBtu
$6.78

134

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.2k
MMBtu
4.7%
- Electrical $20k 214k
kWh
6.9%
- Natural Gas $5.5k -
MMBtu
-
Waste $0.2k
Productivity/Other $2.3k
TOTAL $33k
*May be negative reflecting an increased cost component required to save energy and costs overall