ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paint and coating manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

52

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $629k 121k
MMBtu
$10.32
- Electrical $298k 6,355k
kWh
$0.077
- Natural Gas $207k 56k
MMBtu
$7.36

437

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $90k 5.4k
MMBtu
4.4%
- Electrical $37k 523k
kWh
8.2%
- Natural Gas $36k -
MMBtu
-
Waste $9.4k
Productivity/Other $6.5k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall

47

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $674k 133k
MMBtu
$8.89
- Electrical $322k 6,990k
kWh
$0.066
- Natural Gas $221k 61k
MMBtu
$6.68

171

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.1k
MMBtu
1.6%
- Electrical $16k 204k
kWh
2.9%
- Natural Gas $12k -
MMBtu
-
Waste $4.9k
Productivity/Other $3.5k
TOTAL $39k
*May be negative reflecting an increased cost component required to save energy and costs overall