ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paint and coating manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

47

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $674k 133k
MMBtu
$8.89
- Electrical $322k 6,990k
kWh
$0.066
- Natural Gas $221k 61k
MMBtu
$6.68

399

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $93k 5.8k
MMBtu
4.4%
- Electrical $38k 563k
kWh
8.1%
- Natural Gas $37k -
MMBtu
-
Waste $10k
Productivity/Other $4.4k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

44

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $593k 123k
MMBtu
$8.78
- Electrical $275k 6,437k
kWh
$0.065
- Natural Gas $211k 57k
MMBtu
$6.98

166

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.1k
MMBtu
1.7%
- Electrical $16k 208k
kWh
3.2%
- Natural Gas $13k -
MMBtu
-
Waste $5.2k
Productivity/Other $3.7k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall