ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paint, coating, and adhesive manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

87

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $560k 93k
MMBtu
$9.55
- Electrical $274k 5,239k
kWh
$0.071
- Natural Gas $168k 39k
MMBtu
$6.76

731

Recommendations

8.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $79k 5.2k
MMBtu
5.6%
- Electrical $36k 510k
kWh
9.7%
- Natural Gas $27k -
MMBtu
-
Waste $8.5k
Productivity/Other $5.0k
TOTAL $93k
*May be negative reflecting an increased cost component required to save energy and costs overall

80

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $565k 96k
MMBtu
$9.30
- Electrical $281k 5,350k
kWh
$0.071
- Natural Gas $175k 42k
MMBtu
$6.75

310

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $30k 2.1k
MMBtu
2.2%
- Electrical $18k 206k
kWh
3.8%
- Natural Gas $9.5k -
MMBtu
-
Waste $3.0k
Productivity/Other $3.0k
TOTAL $36k
*May be negative reflecting an increased cost component required to save energy and costs overall