ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paint, coating, and adhesive manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

83

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $554k 94k
MMBtu
$9.38
- Electrical $274k 5,233k
kWh
$0.071
- Natural Gas $170k 40k
MMBtu
$6.72

683

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $77k 5.1k
MMBtu
5.4%
- Electrical $36k 497k
kWh
9.5%
- Natural Gas $27k -
MMBtu
-
Waste $8.5k
Productivity/Other $4.4k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall

76

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $521k 91k
MMBtu
$9.26
- Electrical $256k 5,030k
kWh
$0.071
- Natural Gas $169k 39k
MMBtu
$6.90

300

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 2.2k
MMBtu
2.4%
- Electrical $18k 210k
kWh
4.2%
- Natural Gas $10.0k -
MMBtu
-
Waste $3.1k
Productivity/Other $3.1k
TOTAL $37k
*May be negative reflecting an increased cost component required to save energy and costs overall