ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS In-vitro diagnostic substance manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $648k 66k
MMBtu
$10.55
- Electrical $388k 5,749k
kWh
$0.070
- Natural Gas $42k 6.7k
MMBtu
$7.03

14

Recommendations

4.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $55k 3.4k
MMBtu
5.2%
- Electrical $22k 336k
kWh
5.8%
- Natural Gas $0.5k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $55k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $648k 66k
MMBtu
$10.55
- Electrical $388k 5,749k
kWh
$0.070
- Natural Gas $42k 6.7k
MMBtu
$7.03

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 1.0k
MMBtu
1.5%
- Electrical $9.9k 99k
kWh
1.7%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall