ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Medicinal and botanical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

22

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $804k 132k
MMBtu
$8.59
- Electrical $380k 7,168k
kWh
$0.065
- Natural Gas $194k 29k
MMBtu
$6.74

148

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 5.7k
MMBtu
4.3%
- Electrical $46k 556k
kWh
7.8%
- Natural Gas $9.9k -
MMBtu
-
Waste $0.4k
Productivity/Other $17k
TOTAL $93k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $849k 141k
MMBtu
$8.52
- Electrical $404k 7,567k
kWh
$0.065
- Natural Gas $202k 31k
MMBtu
$6.84

48

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $27k 1.6k
MMBtu
1.2%
- Electrical $16k 159k
kWh
2.1%
- Natural Gas $4.4k -
MMBtu
-
Waste $0.1k
Productivity/Other $1.7k
TOTAL $28k
*May be negative reflecting an increased cost component required to save energy and costs overall