ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fertilizer (mixing only) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $464k 77k
MMBtu
$7.06
- Electrical $233k 4,549k
kWh
$0.060
- Natural Gas $147k 26k
MMBtu
$6.26

40

Recommendations

5.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 4.0k
MMBtu
5.3%
- Electrical $22k 394k
kWh
8.7%
- Natural Gas $22k -
MMBtu
-
Waste $38k
Productivity/Other $29k
TOTAL $120k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $596k 98k
MMBtu
$7.35
- Electrical $309k 6,168k
kWh
$0.056
- Natural Gas $198k 34k
MMBtu
$7.67

17

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.4k
MMBtu
3.5%
- Electrical $18k 330k
kWh
5.3%
- Natural Gas $15k -
MMBtu
-
Waste -
Productivity/Other ($-0.5)k
TOTAL $38k
*May be negative reflecting an increased cost component required to save energy and costs overall