ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Fertilizer manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,804k 351k
MMBtu
$7.79
- Electrical $388k 14,950k
kWh
$0.054
- Natural Gas $761k 195k
MMBtu
$6.28

59

Recommendations

5.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $64k 5.3k
MMBtu
1.5%
- Electrical $30k 516k
kWh
3.5%
- Natural Gas $23k -
MMBtu
-
Waste $24k
Productivity/Other $62k
TOTAL $150k
*May be negative reflecting an increased cost component required to save energy and costs overall

10

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,970k 385k
MMBtu
$7.65
- Electrical $419k 16,363k
kWh
$0.050
- Natural Gas $833k 214k
MMBtu
$6.36

28

Implemented Recommendations

2.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 2.5k
MMBtu
0.6%
- Electrical $13k 243k
kWh
1.5%
- Natural Gas $17k -
MMBtu
-
Waste $0.0k
Productivity/Other $5.1k
TOTAL $45k