ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Resin, synthetic rubber, and artificial synthetic fibers and filaments manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

147

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,951k 333k
MMBtu
$7.68
- Electrical $964k 19,680k
kWh
$0.11
- Natural Gas $668k 127k
MMBtu
$6.42

1,155

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $152k 15k
MMBtu
4.4%
- Electrical $84k 1,431k
kWh
7.3%
- Natural Gas $39k -
MMBtu
-
Waste $5.4k
Productivity/Other $23k
TOTAL $181k
*May be negative reflecting an increased cost component required to save energy and costs overall

132

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,057k 353k
MMBtu
$7.53
- Electrical $1,007k 20,565k
kWh
$0.11
- Natural Gas $728k 138k
MMBtu
$6.36

465

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $51k 5.7k
MMBtu
1.6%
- Electrical $28k 555k
kWh
2.7%
- Natural Gas $16k -
MMBtu
-
Waste $3.3k
Productivity/Other $14k
TOTAL $68k
*May be negative reflecting an increased cost component required to save energy and costs overall