ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cyclic crude, intermediate, and gum and wood chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,292k 893k
MMBtu
$5.78
- Electrical $1,546k 21,826k
kWh
$0.068
- Natural Gas $1,942k 569k
MMBtu
$5.35

30

Recommendations

10.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $845k 105k
MMBtu
11.7%
- Electrical $798k 10,227k
kWh
46.9%
- Natural Gas ($-83.6)k -
MMBtu
-
Waste -
Productivity/Other ($-8.8)k
TOTAL $836k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,292k 893k
MMBtu
$5.78
- Electrical $1,546k 21,826k
kWh
$0.068
- Natural Gas $1,942k 569k
MMBtu
$5.35

17

Implemented Recommendations

5.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $226k 8.2k
MMBtu
0.9%
- Electrical $59k 798k
kWh
3.7%
- Natural Gas $116k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $227k