ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Industrial gas manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $911k 131k
MMBtu
$9.02
- Electrical $650k 12,596k
kWh
$0.077
- Natural Gas $15k 2.3k
MMBtu
$6.88

50

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 5.5k
MMBtu
4.2%
- Electrical $39k 534k
kWh
4.2%
- Natural Gas $1.0k -
MMBtu
-
Waste -
Productivity/Other $4.1k
TOTAL $52k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $911k 131k
MMBtu
$9.02
- Electrical $650k 12,596k
kWh
$0.077
- Natural Gas $15k 2.3k
MMBtu
$6.88

5

Implemented Recommendations

0.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $1.3k 0.0k
MMBtu
0.0%
- Electrical $0.1k 0.7k
kWh
0.0%
- Natural Gas $0.8k -
MMBtu
-
Waste -
Productivity/Other $0.1k
TOTAL $1.4k
*May be negative reflecting an increased cost component required to save energy and costs overall