The ITAC Statistics page displays the average assessment results for the selected criteria.
7
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $911k | 131k |
MMBtu
|
$9.02 |
- Electrical | $650k | 12,596k |
kWh
|
$0.077 |
- Natural Gas | $15k | 2.3k |
MMBtu
|
$6.88 |
50
Recommendations
7.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $48k | 5.5k |
MMBtu
|
4.2% |
- Electrical | $39k | 534k |
kWh
|
4.2% |
- Natural Gas | $1.0k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $4.1k | |||
TOTAL | $52k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
7
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $911k | 131k |
MMBtu
|
$9.02 |
- Electrical | $650k | 12,596k |
kWh
|
$0.077 |
- Natural Gas | $15k | 2.3k |
MMBtu
|
$6.88 |
5
Implemented Recommendations
0.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $1.3k | 0.0k |
MMBtu
|
0.0% |
- Electrical | $0.1k | 0.7k |
kWh
|
0.0% |
- Natural Gas | $0.8k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $0.1k | |||
TOTAL | $1.4k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |