ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC Shut off cooling if cold outside air will cool process
NAICS Petrochemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $10,287k 3,025k
MMBtu
$7.40
- Electrical $3,363k 117,085k
kWh
$0.059
- Natural Gas $5,599k 1,816k
MMBtu
$4.59

88

Recommendations

7.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3,159k 26k
MMBtu
0.9%
- Electrical $139k 2,541k
kWh
2.2%
- Natural Gas $3,001k -
MMBtu
-
Waste $191k
Productivity/Other $65k
TOTAL $3,416k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $10,287k 3,025k
MMBtu
$7.40
- Electrical $3,363k 117,085k
kWh
$0.059
- Natural Gas $5,599k 1,816k
MMBtu
$4.59

29

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $95k 12k
MMBtu
0.4%
- Electrical $60k 1,208k
kWh
1.0%
- Natural Gas $32k -
MMBtu
-
Waste $12k
Productivity/Other $11k
TOTAL $118k
*May be negative reflecting an increased cost component required to save energy and costs overall