ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Petrochemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $11,205k 3,299k
MMBtu
$6.46
- Electrical $3,668k 127,696k
kWh
$0.061
- Natural Gas $6,108k 1,981k
MMBtu
$5.00

82

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $3,440k 28k
MMBtu
0.9%
- Electrical $152k 2,772k
kWh
2.2%
- Natural Gas $3,274k -
MMBtu
-
Waste $209k
Productivity/Other ($-1.0)k
TOTAL $3,648k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $11,205k 3,299k
MMBtu
$6.46
- Electrical $3,668k 127,696k
kWh
$0.061
- Natural Gas $6,108k 1,981k
MMBtu
$5.00

26

Implemented Recommendations

2.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 14k
MMBtu
0.4%
- Electrical $65k 1,318k
kWh
1.0%
- Natural Gas $35k -
MMBtu
-
Waste $13k
Productivity/Other $1.6k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall