ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

754

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,879k 430k
MMBtu
$8.63
- Electrical $833k 17,814k
kWh
$0.076
- Natural Gas $711k 229k
MMBtu
$6.62

5,970

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $235k 19k
MMBtu
4.5%
- Electrical $108k 1,877k
kWh
10.5%
- Natural Gas $93k -
MMBtu
-
Waste $14k
Productivity/Other $35k
TOTAL $284k
*May be negative reflecting an increased cost component required to save energy and costs overall

691

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,971k 456k
MMBtu
$8.45
- Electrical $870k 18,712k
kWh
$0.075
- Natural Gas $755k 245k
MMBtu
$6.64

2,453

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $78k 5.9k
MMBtu
1.3%
- Electrical $35k 571k
kWh
3.1%
- Natural Gas $34k -
MMBtu
-
Waste $3.9k
Productivity/Other $21k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall