ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

788

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,846k 417k
MMBtu
$8.72
- Electrical $822k 17,421k
kWh
$0.076
- Natural Gas $693k 221k
MMBtu
$6.63

6,195

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $230k 19k
MMBtu
4.5%
- Electrical $106k 1,834k
kWh
10.5%
- Natural Gas $90k -
MMBtu
-
Waste $14k
Productivity/Other $34k
TOTAL $278k
*May be negative reflecting an increased cost component required to save energy and costs overall

724

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,934k 445k
MMBtu
$8.54
- Electrical $857k 18,376k
kWh
$0.075
- Natural Gas $735k 238k
MMBtu
$6.58

2,582

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 5.7k
MMBtu
1.3%
- Electrical $35k 558k
kWh
3.0%
- Natural Gas $33k -
MMBtu
-
Waste $3.8k
Productivity/Other $21k
TOTAL $101k
*May be negative reflecting an increased cost component required to save energy and costs overall