ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

800

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,848k 415k
MMBtu
$8.76
- Electrical $819k 17,374k
kWh
$0.076
- Natural Gas $690k 220k
MMBtu
$6.66

6,268

Recommendations

7.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $229k 19k
MMBtu
4.5%
- Electrical $105k 1,816k
kWh
10.5%
- Natural Gas $90k -
MMBtu
-
Waste $14k
Productivity/Other $35k
TOTAL $278k
*May be negative reflecting an increased cost component required to save energy and costs overall

736

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,929k 441k
MMBtu
$8.58
- Electrical $856k 18,229k
kWh
$0.076
- Natural Gas $731k 235k
MMBtu
$6.57

2,612

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $76k 5.7k
MMBtu
1.3%
- Electrical $34k 552k
kWh
3.0%
- Natural Gas $33k -
MMBtu
-
Waste $3.7k
Productivity/Other $21k
TOTAL $100k
*May be negative reflecting an increased cost component required to save energy and costs overall