ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Chemical manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

712

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,924k 444k
MMBtu
$8.37
- Electrical $849k 18,263k
kWh
$0.075
- Natural Gas $736k 238k
MMBtu
$6.63

5,624

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $241k 20k
MMBtu
4.5%
- Electrical $110k 1,933k
kWh
10.6%
- Natural Gas $97k -
MMBtu
-
Waste $14k
Productivity/Other $34k
TOTAL $289k
*May be negative reflecting an increased cost component required to save energy and costs overall

651

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,989k 468k
MMBtu
$8.23
- Electrical $876k 19,085k
kWh
$0.075
- Natural Gas $770k 252k
MMBtu
$6.65

2,295

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 5.7k
MMBtu
1.2%
- Electrical $34k 558k
kWh
2.9%
- Natural Gas $36k -
MMBtu
-
Waste $4.1k
Productivity/Other $21k
TOTAL $101k
*May be negative reflecting an increased cost component required to save energy and costs overall