ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Asphalt shingle and coating materials manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

39

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,161k 241k
MMBtu
$7.20
- Electrical $417k 6,852k
kWh
$0.067
- Natural Gas $609k 170k
MMBtu
$5.66

300

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $131k 8.6k
MMBtu
3.6%
- Electrical $47k 835k
kWh
12.2%
- Natural Gas $67k -
MMBtu
-
Waste $17k
Productivity/Other $64k
TOTAL $212k
*May be negative reflecting an increased cost component required to save energy and costs overall

39

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,161k 241k
MMBtu
$7.20
- Electrical $417k 6,852k
kWh
$0.067
- Natural Gas $609k 170k
MMBtu
$5.66

160

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $49k 2.9k
MMBtu
1.2%
- Electrical $19k 280k
kWh
4.1%
- Natural Gas $28k -
MMBtu
-
Waste $0.4k
Productivity/Other $41k
TOTAL $91k
*May be negative reflecting an increased cost component required to save energy and costs overall