ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Asphalt paving, roofing, and saturated materials manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

88

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $957k 184k
MMBtu
$7.74
- Electrical $270k 4,135k
kWh
$0.079
- Natural Gas $478k 126k
MMBtu
$5.00

621

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $142k 5.7k
MMBtu
3.1%
- Electrical $38k 556k
kWh
13.5%
- Natural Gas $53k -
MMBtu
-
Waste $7.3k
Productivity/Other $62k
TOTAL $212k
*May be negative reflecting an increased cost component required to save energy and costs overall

77

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,014k 199k
MMBtu
$7.78
- Electrical $289k 4,439k
kWh
$0.079
- Natural Gas $511k 137k
MMBtu
$5.12

267

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $61k 2.1k
MMBtu
1.0%
- Electrical $16k 201k
kWh
4.5%
- Natural Gas $17k -
MMBtu
-
Waste $0.2k
Productivity/Other $46k
TOTAL $107k
*May be negative reflecting an increased cost component required to save energy and costs overall