ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Asphalt paving, roofing, and saturated materials manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

91

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $970k 183k
MMBtu
$7.96
- Electrical $281k 4,188k
kWh
$0.081
- Natural Gas $476k 125k
MMBtu
$4.94

639

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $141k 5.8k
MMBtu
3.1%
- Electrical $40k 561k
kWh
13.4%
- Natural Gas $52k -
MMBtu
-
Waste $7.1k
Productivity/Other $60k
TOTAL $208k
*May be negative reflecting an increased cost component required to save energy and costs overall

79

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $999k 196k
MMBtu
$7.74
- Electrical $283k 4,352k
kWh
$0.079
- Natural Gas $506k 135k
MMBtu
$5.12

271

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $60k 2.0k
MMBtu
1.0%
- Electrical $16k 200k
kWh
4.6%
- Natural Gas $16k -
MMBtu
-
Waste $0.2k
Productivity/Other $44k
TOTAL $105k