ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Petroleum refineries
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $11,054k 2,418k
MMBtu
$6.18
- Electrical $3,172k 54,346k
kWh
$0.071
- Natural Gas $7,772k 1,861k
MMBtu
$4.24

75

Recommendations

9.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $961k 27k
MMBtu
1.1%
- Electrical $169k 2,672k
kWh
4.9%
- Natural Gas $571k -
MMBtu
-
Waste $1.2k
Productivity/Other $78k
TOTAL $1,041k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $11,054k 2,418k
MMBtu
$6.18
- Electrical $3,172k 54,346k
kWh
$0.071
- Natural Gas $7,772k 1,861k
MMBtu
$4.24

25

Implemented Recommendations

3.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $322k 3.1k
MMBtu
0.1%
- Electrical $12k 305k
kWh
0.6%
- Natural Gas $139k -
MMBtu
-
Waste -
Productivity/Other $68k
TOTAL $390k
*May be negative reflecting an increased cost component required to save energy and costs overall