ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Petroleum and coal products manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

128

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,204k 533k
MMBtu
$7.76
- Electrical $1,177k 17,772k
kWh
$0.076
- Natural Gas $1,800k 331k
MMBtu
$5.27

941

Recommendations

7.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $261k 7.6k
MMBtu
1.4%
- Electrical $48k 744k
kWh
4.2%
- Natural Gas $150k -
MMBtu
-
Waste $5.7k
Productivity/Other $56k
TOTAL $322k
*May be negative reflecting an increased cost component required to save energy and costs overall

115

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,487k 583k
MMBtu
$7.78
- Electrical $1,289k 19,456k
kWh
$0.076
- Natural Gas $1,977k 362k
MMBtu
$5.43

391

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $99k 2.4k
MMBtu
0.4%
- Electrical $16k 234k
kWh
1.2%
- Natural Gas $46k -
MMBtu
-
Waste $0.2k
Productivity/Other $39k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall