The ITAC Statistics page displays the average assessment results for the selected criteria.
124
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $3,285k | 549k |
MMBtu
|
$7.68 |
- Electrical | $1,209k | 18,227k |
kWh
|
$0.076 |
- Natural Gas | $1,856k | 341k |
MMBtu
|
$5.34 |
923
Recommendations
7.4
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $266k | 7.5k |
MMBtu
|
1.4% |
- Electrical | $48k | 731k |
kWh
|
4.0% |
- Natural Gas | $155k | - |
MMBtu
|
- |
Waste | $5.8k | |||
Productivity/Other | $57k | |||
TOTAL | $329k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
113
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $3,531k | 590k |
MMBtu
|
$7.80 |
- Electrical | $1,306k | 19,737k |
kWh
|
$0.074 |
- Natural Gas | $2,005k | 366k |
MMBtu
|
$5.46 |
386
Implemented Recommendations
3.4
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $100k | 2.4k |
MMBtu
|
0.4% |
- Electrical | $16k | 235k |
kWh
|
1.2% |
- Natural Gas | $47k | - |
MMBtu
|
- |
Waste | $0.2k | |||
Productivity/Other | $38k | |||
TOTAL | $138k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |