ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Books printing
SIC 2+ Digits Required
3+ Characters Required for Products

12

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,199k 143k
MMBtu
$8.60
- Electrical $717k 11,921k
kWh
$0.061
- Natural Gas $186k 20k
MMBtu
$9.53

100

Recommendations

8.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $197k 18k
MMBtu
12.6%
- Electrical $138k 1,762k
kWh
14.8%
- Natural Gas $36k -
MMBtu
-
Waste -
Productivity/Other $16k
TOTAL $213k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,286k 152k
MMBtu
$8.81
- Electrical $764k 12,715k
kWh
$0.061
- Natural Gas $199k 22k
MMBtu
$9.77

46

Implemented Recommendations

4.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $140k 14k
MMBtu
8.9%
- Electrical $109k 1,328k
kWh
10.4%
- Natural Gas $17k -
MMBtu
-
Waste -
Productivity/Other $3.7k
TOTAL $143k
*May be negative reflecting an increased cost component required to save energy and costs overall