ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial screen printing
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $369k 47k
MMBtu
$8.83
- Electrical $236k 3,596k
kWh
$0.066
- Natural Gas $67k 9.6k
MMBtu
$6.62

128

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $54k 5.0k
MMBtu
10.7%
- Electrical $32k 488k
kWh
13.6%
- Natural Gas $8.4k -
MMBtu
-
Waste $0.2k
Productivity/Other $52k
TOTAL $106k
*May be negative reflecting an increased cost component required to save energy and costs overall

16

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $373k 49k
MMBtu
$8.45
- Electrical $245k 3,746k
kWh
$0.065
- Natural Gas $74k 11k
MMBtu
$7.07

62

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $29k 2.8k
MMBtu
5.8%
- Electrical $18k 277k
kWh
7.4%
- Natural Gas $6.7k -
MMBtu
-
Waste -
Productivity/Other $48k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall