ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Commercial printing (except screen and books)
SIC 2+ Digits Required
3+ Characters Required for Products

216

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $658k 88k
MMBtu
$9.87
- Electrical $373k 6,634k
kWh
$0.18
- Natural Gas $130k 19k
MMBtu
$6.49

1,766

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $75k 6.8k
MMBtu
7.7%
- Electrical $40k 661k
kWh
10.0%
- Natural Gas $17k -
MMBtu
-
Waste $2.2k
Productivity/Other $37k
TOTAL $114k
*May be negative reflecting an increased cost component required to save energy and costs overall

206

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $677k 91k
MMBtu
$9.36
- Electrical $384k 6,874k
kWh
$0.18
- Natural Gas $136k 20k
MMBtu
$6.48

793

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $32k 2.9k
MMBtu
3.2%
- Electrical $17k 280k
kWh
4.1%
- Natural Gas $9.7k -
MMBtu
-
Waste $0.3k
Productivity/Other $8.5k
TOTAL $41k
*May be negative reflecting an increased cost component required to save energy and costs overall