ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,996k 654k
MMBtu
$9.68
- Electrical $2,098k 52,468k
kWh
$0.067
- Natural Gas $809k 110k
MMBtu
$7.88

145

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 4.1k
MMBtu
0.6%
- Electrical $25k 399k
kWh
0.8%
- Natural Gas $56k -
MMBtu
-
Waste $0.0k
Productivity/Other $5.4k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall

19

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,278k 720k
MMBtu
$9.42
- Electrical $2,297k 57,781k
kWh
$0.063
- Natural Gas $888k 120k
MMBtu
$7.15

61

Implemented Recommendations

3.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $74k 1.6k
MMBtu
0.2%
- Electrical $9.0k 153k
kWh
0.3%
- Natural Gas $55k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.3k
TOTAL $74k
*May be negative reflecting an increased cost component required to save energy and costs overall