ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

29

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,828k 1,464k
MMBtu
$9.55
- Electrical $1,862k 46,691k
kWh
$0.069
- Natural Gas $673k 973k
MMBtu
$7.18

229

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $152k 11k
MMBtu
0.8%
- Electrical $58k 1,099k
kWh
2.4%
- Natural Gas $60k -
MMBtu
-
Waste $2.6k
Productivity/Other $4.5k
TOTAL $159k
*May be negative reflecting an increased cost component required to save energy and costs overall

27

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $3,014k 1,570k
MMBtu
$9.35
- Electrical $1,985k 50,002k
kWh
$0.066
- Natural Gas $718k 1,044k
MMBtu
$6.61

102

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $102k 5.2k
MMBtu
0.3%
- Electrical $29k 505k
kWh
1.0%
- Natural Gas $54k -
MMBtu
-
Waste $0.0k
Productivity/Other $0.9k
TOTAL $103k
*May be negative reflecting an increased cost component required to save energy and costs overall