ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Stationery product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

21

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $542k 71k
MMBtu
$8.69
- Electrical $343k 6,268k
kWh
$0.062
- Natural Gas $45k 5.0k
MMBtu
$7.04

160

Recommendations

7.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $67k 8.0k
MMBtu
11.3%
- Electrical $38k 784k
kWh
12.5%
- Natural Gas $14k -
MMBtu
-
Waste $2.2k
Productivity/Other $12k
TOTAL $81k
*May be negative reflecting an increased cost component required to save energy and costs overall

20

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $565k 74k
MMBtu
$8.54
- Electrical $357k 6,549k
kWh
$0.062
- Natural Gas $47k 5.3k
MMBtu
$6.29

74

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.4k
MMBtu
3.3%
- Electrical $15k 237k
kWh
3.6%
- Natural Gas $1.0k -
MMBtu
-
Waste $1.3k
Productivity/Other $5.9k
TOTAL $30k
*May be negative reflecting an increased cost component required to save energy and costs overall