ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other paperboard container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

18

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 78k
MMBtu
$8.82
- Electrical $278k 5,200k
kWh
$0.072
- Natural Gas $153k 25k
MMBtu
$7.06

127

Recommendations

7.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $70k 5.3k
MMBtu
6.7%
- Electrical $35k 513k
kWh
9.9%
- Natural Gas $21k -
MMBtu
-
Waste $2.0k
Productivity/Other $6.6k
TOTAL $79k
*May be negative reflecting an increased cost component required to save energy and costs overall

18

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $600k 78k
MMBtu
$8.82
- Electrical $278k 5,200k
kWh
$0.072
- Natural Gas $153k 25k
MMBtu
$7.06

49

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.1k
MMBtu
4.0%
- Electrical $17k 304k
kWh
5.8%
- Natural Gas $6.9k -
MMBtu
-
Waste $2.0k
Productivity/Other $5.2k
TOTAL $43k
*May be negative reflecting an increased cost component required to save energy and costs overall