ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Corrugated and solid fiber box manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

109

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $599k 86k
MMBtu
$8.33
- Electrical $243k 4,191k
kWh
$0.068
- Natural Gas $250k 42k
MMBtu
$6.37

989

Recommendations

9.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $109k 8.5k
MMBtu
9.9%
- Electrical $53k 829k
kWh
19.8%
- Natural Gas $35k -
MMBtu
-
Waste $3.9k
Productivity/Other $92k
TOTAL $205k
*May be negative reflecting an increased cost component required to save energy and costs overall

102

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $587k 87k
MMBtu
$7.96
- Electrical $234k 4,150k
kWh
$0.066
- Natural Gas $255k 43k
MMBtu
$6.49

411

Implemented Recommendations

4.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $38k 2.4k
MMBtu
2.8%
- Electrical $13k 237k
kWh
5.7%
- Natural Gas $22k -
MMBtu
-
Waste $0.7k
Productivity/Other $15k
TOTAL $53k
*May be negative reflecting an increased cost component required to save energy and costs overall