ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
NAICS 32221 Paperboard container manufacturing

172

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $583k 82k
MMBtu
$8.37
- Electrical $259k 4,649k
kWh
$0.066
- Natural Gas $210k 34k
MMBtu
$6.63

1,459

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $98k 7.9k
MMBtu
9.7%
- Electrical $48k 775k
kWh
16.7%
- Natural Gas $29k -
MMBtu
-
Waste $3.0k
Productivity/Other $77k
TOTAL $178k
*May be negative reflecting an increased cost component required to save energy and costs overall

165

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $576k 83k
MMBtu
$8.06
- Electrical $255k 4,661k
kWh
$0.065
- Natural Gas $212k 34k
MMBtu
$6.74

613

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 2.8k
MMBtu
3.3%
- Electrical $14k 269k
kWh
5.8%
- Natural Gas $16k -
MMBtu
-
Waste $0.7k
Productivity/Other $13k
TOTAL $49k
*May be negative reflecting an increased cost component required to save energy and costs overall