ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paperboard container manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

171

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $582k 82k
MMBtu
$8.37
- Electrical $259k 4,644k
kWh
$0.066
- Natural Gas $209k 34k
MMBtu
$6.63

1,454

Recommendations

8.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $97k 7.8k
MMBtu
9.5%
- Electrical $47k 758k
kWh
16.3%
- Natural Gas $30k -
MMBtu
-
Waste $3.0k
Productivity/Other $78k
TOTAL $178k
*May be negative reflecting an increased cost component required to save energy and costs overall

163

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $573k 82k
MMBtu
$8.06
- Electrical $253k 4,645k
kWh
$0.065
- Natural Gas $212k 34k
MMBtu
$6.75

603

Implemented Recommendations

3.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 2.7k
MMBtu
3.3%
- Electrical $13k 264k
kWh
5.7%
- Natural Gas $16k -
MMBtu
-
Waste $0.8k
Productivity/Other $13k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall