ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Converted paper product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

288

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $840k 224k
MMBtu
$8.54
- Electrical $455k 9,496k
kWh
$0.065
- Natural Gas $241k 124k
MMBtu
$6.75

2,349

Recommendations

8.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 8.5k
MMBtu
3.8%
- Electrical $49k 832k
kWh
8.8%
- Natural Gas $34k -
MMBtu
-
Waste $2.6k
Productivity/Other $54k
TOTAL $160k
*May be negative reflecting an increased cost component required to save energy and costs overall

274

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $830k 228k
MMBtu
$8.26
- Electrical $447k 9,450k
kWh
$0.064
- Natural Gas $246k 130k
MMBtu
$6.76

980

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $39k 3.1k
MMBtu
1.3%
- Electrical $16k 298k
kWh
3.2%
- Natural Gas $17k -
MMBtu
-
Waste $0.7k
Productivity/Other $9.9k
TOTAL $50k
*May be negative reflecting an increased cost component required to save energy and costs overall