ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paperboard mills
SIC 2+ Digits Required
3+ Characters Required for Products

25

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,394k 1,792k
MMBtu
$5.28
- Electrical $2,486k 57,483k
kWh
$0.049
- Natural Gas $1,877k 886k
MMBtu
$4.39

193

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $369k 52k
MMBtu
2.9%
- Electrical $196k 5,049k
kWh
8.8%
- Natural Gas $51k -
MMBtu
-
Waste $5.4k
Productivity/Other $9.8k
TOTAL $384k
*May be negative reflecting an increased cost component required to save energy and costs overall

23

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,281k 1,821k
MMBtu
$5.35
- Electrical $2,436k 56,359k
kWh
$0.050
- Natural Gas $1,807k 899k
MMBtu
$4.45

77

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $82k 6.2k
MMBtu
0.3%
- Electrical $25k 601k
kWh
1.1%
- Natural Gas $22k -
MMBtu
-
Waste $1.6k
Productivity/Other $5.9k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall