ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Newsprint mills
SIC 2+ Digits Required
3+ Characters Required for Products

1

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,229k 215k
MMBtu
$10.36
- Electrical $1,213k 13,376k
kWh
$0.091
- Natural Gas $252k 38k
MMBtu
$6.68

7

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $191k 7.3k
MMBtu
3.4%
- Electrical $83k 716k
kWh
5.4%
- Natural Gas ($-24.9)k -
MMBtu
-
Waste -
Productivity/Other -
TOTAL $191k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,229k 215k
MMBtu
$10.36
- Electrical $1,213k 13,376k
kWh
$0.091
- Natural Gas $252k 38k
MMBtu
$6.68

3

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $40k 3.5k
MMBtu
1.6%
- Electrical $40k 345k
kWh
2.6%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $40k
*May be negative reflecting an increased cost component required to save energy and costs overall