ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paper mills
SIC 2+ Digits Required
3+ Characters Required for Products

60

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,198k 1,275k
MMBtu
$7.88
- Electrical $2,913k 61,431k
kWh
$0.072
- Natural Gas $2,538k 417k
MMBtu
$7.03

460

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $439k 52k
MMBtu
4.0%
- Electrical $169k 5,025k
kWh
8.2%
- Natural Gas $70k -
MMBtu
-
Waste $32k
Productivity/Other $159k
TOTAL $630k
*May be negative reflecting an increased cost component required to save energy and costs overall

57

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,252k 1,294k
MMBtu
$7.93
- Electrical $2,941k 62,753k
kWh
$0.073
- Natural Gas $2,509k 410k
MMBtu
$7.08

222

Implemented Recommendations

3.9

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $214k 6.3k
MMBtu
0.5%
- Electrical $44k 613k
kWh
1.0%
- Natural Gas $49k -
MMBtu
-
Waste -
Productivity/Other $21k
TOTAL $235k
*May be negative reflecting an increased cost component required to save energy and costs overall