ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paper mills
SIC 2+ Digits Required
3+ Characters Required for Products

61

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,093k 1,257k
MMBtu
$7.85
- Electrical $2,874k 60,558k
kWh
$0.072
- Natural Gas $2,500k 411k
MMBtu
$6.98

472

Recommendations

7.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $438k 51k
MMBtu
4.1%
- Electrical $170k 5,006k
kWh
8.3%
- Natural Gas $70k -
MMBtu
-
Waste $32k
Productivity/Other $157k
TOTAL $626k
*May be negative reflecting an increased cost component required to save energy and costs overall

60

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $7,198k 1,275k
MMBtu
$7.88
- Electrical $2,913k 61,431k
kWh
$0.072
- Natural Gas $2,538k 417k
MMBtu
$7.03

230

Implemented Recommendations

3.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $210k 5.7k
MMBtu
0.4%
- Electrical $41k 557k
kWh
0.9%
- Natural Gas $55k -
MMBtu
-
Waste $1.4k
Productivity/Other $20k
TOTAL $232k
*May be negative reflecting an increased cost component required to save energy and costs overall