The ITAC Statistics page displays the average assessment results for the selected criteria.
6
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $5,937k | 1,559k |
MMBtu
|
$6.79 |
- Electrical | $3,069k | 103,875k |
kWh
|
$0.058 |
- Natural Gas | $2,376k | 482k |
MMBtu
|
$4.16 |
38
Recommendations
6.3
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $726k | 3.4k |
MMBtu
|
0.2% |
- Electrical | $41k | 330k |
kWh
|
0.3% |
- Natural Gas | $670k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $8.6k | |||
TOTAL | $734k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
6
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $5,937k | 1,559k |
MMBtu
|
$6.79 |
- Electrical | $3,069k | 103,875k |
kWh
|
$0.058 |
- Natural Gas | $2,376k | 482k |
MMBtu
|
$4.16 |
15
Implemented Recommendations
2.5
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $87k | 8.0k |
MMBtu
|
0.5% |
- Electrical | $21k | 783k |
kWh
|
0.8% |
- Natural Gas | $56k | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $87k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |