ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Pulp mills
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,439k 1,422k
MMBtu
$6.40
- Electrical $2,949k 92,752k
kWh
$0.062
- Natural Gas $2,068k 460k
MMBtu
$3.66

44

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $699k 12k
MMBtu
0.9%
- Electrical $113k 1,188k
kWh
1.3%
- Natural Gas $574k -
MMBtu
-
Waste -
Productivity/Other $6.9k
TOTAL $706k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,937k 1,559k
MMBtu
$6.79
- Electrical $3,069k 103,875k
kWh
$0.058
- Natural Gas $2,376k 482k
MMBtu
$4.16

15

Implemented Recommendations

2.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $87k 8.0k
MMBtu
0.5%
- Electrical $21k 783k
kWh
0.8%
- Natural Gas $56k -
MMBtu
-
Waste -
Productivity/Other ($-0.1)k
TOTAL $87k