ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

377

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,222k 515k
MMBtu
$8.18
- Electrical $1,012k 22,242k
kWh
$0.065
- Natural Gas $750k 228k
MMBtu
$6.62

3,028

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $182k 18k
MMBtu
3.4%
- Electrical $76k 1,732k
kWh
7.8%
- Natural Gas $51k -
MMBtu
-
Waste $7.5k
Productivity/Other $68k
TOTAL $257k
*May be negative reflecting an increased cost component required to save energy and costs overall

360

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,290k 534k
MMBtu
$7.98
- Electrical $1,044k 23,018k
kWh
$0.064
- Natural Gas $773k 236k
MMBtu
$6.64

1,300

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 3.8k
MMBtu
0.7%
- Electrical $21k 372k
kWh
1.6%
- Natural Gas $24k -
MMBtu
-
Waste $0.9k
Productivity/Other $11k
TOTAL $84k