ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

371

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,250k 522k
MMBtu
$8.13
- Electrical $1,025k 22,546k
kWh
$0.065
- Natural Gas $760k 231k
MMBtu
$6.61

2,983

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $181k 18k
MMBtu
3.4%
- Electrical $74k 1,727k
kWh
7.7%
- Natural Gas $51k -
MMBtu
-
Waste $7.6k
Productivity/Other $68k
TOTAL $257k
*May be negative reflecting an increased cost component required to save energy and costs overall

352

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,256k 532k
MMBtu
$7.98
- Electrical $1,030k 22,890k
kWh
$0.064
- Natural Gas $753k 234k
MMBtu
$6.61

1,275

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 3.9k
MMBtu
0.7%
- Electrical $21k 380k
kWh
1.7%
- Natural Gas $23k -
MMBtu
-
Waste $0.6k
Productivity/Other $11k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall