ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

380

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,224k 514k
MMBtu
$8.19
- Electrical $1,018k 22,340k
kWh
$0.065
- Natural Gas $745k 226k
MMBtu
$6.59

3,052

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $184k 18k
MMBtu
3.5%
- Electrical $78k 1,771k
kWh
7.9%
- Natural Gas $51k -
MMBtu
-
Waste $7.5k
Productivity/Other $67k
TOTAL $259k
*May be negative reflecting an increased cost component required to save energy and costs overall

365

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,273k 529k
MMBtu
$7.97
- Electrical $1,035k 22,837k
kWh
$0.064
- Natural Gas $769k 234k
MMBtu
$6.60

1,306

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $71k 3.8k
MMBtu
0.7%
- Electrical $21k 367k
kWh
1.6%
- Natural Gas $24k -
MMBtu
-
Waste $0.8k
Productivity/Other $11k
TOTAL $83k
*May be negative reflecting an increased cost component required to save energy and costs overall