Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Paper manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

405

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,210k 499k
MMBtu
$8.33
- Electrical $1,019k 21,972k
kWh
$0.066
- Natural Gas $716k 217k
MMBtu
$6.55

3,227

Recommendations

8.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $184k 18k
MMBtu
3.7%
- Electrical $82k 1,804k
kWh
8.2%
- Natural Gas $48k -
MMBtu
-
Waste $7.0k
Productivity/Other $66k
TOTAL $257k
*May be negative reflecting an increased cost component required to save energy and costs overall

380

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,242k 518k
MMBtu
$8.16
- Electrical $1,027k 22,451k
kWh
$0.065
- Natural Gas $751k 229k
MMBtu
$6.48

1,344

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $73k 4.1k
MMBtu
0.8%
- Electrical $23k 404k
kWh
1.8%
- Natural Gas $24k -
MMBtu
-
Waste $0.8k
Productivity/Other $11k
TOTAL $84k
*May be negative reflecting an increased cost component required to save energy and costs overall