ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Prefabricated wood building manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $228k 22k
MMBtu
$13.54
- Electrical $65k 815k
kWh
$0.16
- Natural Gas $124k 13k
MMBtu
$8.16

85

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $33k 2.4k
MMBtu
10.8%
- Electrical $18k 235k
kWh
28.8%
- Natural Gas $6.5k -
MMBtu
-
Waste $2.1k
Productivity/Other $13k
TOTAL $48k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $239k 24k
MMBtu
$13.63
- Electrical $69k 856k
kWh
$0.18
- Natural Gas $132k 14k
MMBtu
$8.18

41

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $13k 1.2k
MMBtu
5.1%
- Electrical $9.7k 117k
kWh
13.7%
- Natural Gas $1.2k -
MMBtu
-
Waste $1.5k
Productivity/Other $3.5k
TOTAL $19k
*May be negative reflecting an increased cost component required to save energy and costs overall