ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS All other wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

85

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $693k 112k
MMBtu
$10.96
- Electrical $352k 5,650k
kWh
$0.089
- Natural Gas $172k 30k
MMBtu
$5.43

562

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $94k 9.2k
MMBtu
8.2%
- Electrical $62k 897k
kWh
15.9%
- Natural Gas $8.0k -
MMBtu
-
Waste $2.2k
Productivity/Other $70k
TOTAL $166k
*May be negative reflecting an increased cost component required to save energy and costs overall

76

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $694k 116k
MMBtu
$10.46
- Electrical $361k 6,009k
kWh
$0.088
- Natural Gas $159k 28k
MMBtu
$5.26

248

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $58k 7.6k
MMBtu
6.5%
- Electrical $49k 738k
kWh
12.3%
- Natural Gas $0.8k -
MMBtu
-
Waste $0.2k
Productivity/Other $13k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall