ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Wood container and pallet manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

15

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $599k 83k
MMBtu
$11.37
- Electrical $331k 4,972k
kWh
$0.083
- Natural Gas $147k 27k
MMBtu
$3.22

113

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $72k 7.1k
MMBtu
8.6%
- Electrical $44k 690k
kWh
13.9%
- Natural Gas ($-2.5)k -
MMBtu
-
Waste $3.2k
Productivity/Other $14k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $623k 86k
MMBtu
$11.64
- Electrical $346k 5,194k
kWh
$0.084
- Natural Gas $151k 27k
MMBtu
$3.08

60

Implemented Recommendations

4.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 2.7k
MMBtu
3.2%
- Electrical $17k 266k
kWh
5.1%
- Natural Gas $2.3k -
MMBtu
-
Waste $0.1k
Productivity/Other $6.4k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall