Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC General
NAICS Other millwork (including flooring)
SIC 2+ Digits Required
3+ Characters Required for Products

50

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $746k 114k
MMBtu
$9.03
- Electrical $421k 7,952k
kWh
$0.065
- Natural Gas $71k 10.0k
MMBtu
$5.47

396

Recommendations

7.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $126k 13k
MMBtu
11.8%
- Electrical $69k 1,314k
kWh
16.5%
- Natural Gas $25k -
MMBtu
-
Waste $0.8k
Productivity/Other $33k
TOTAL $161k
*May be negative reflecting an increased cost component required to save energy and costs overall

48

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $725k 113k
MMBtu
$9.06
- Electrical $404k 7,881k
kWh
$0.065
- Natural Gas $58k 8.2k
MMBtu
$5.29

173

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $48k 4.1k
MMBtu
3.6%
- Electrical $23k 398k
kWh
5.1%
- Natural Gas $11k -
MMBtu
-
Waste $0.0k
Productivity/Other $22k
TOTAL $71k
*May be negative reflecting an increased cost component required to save energy and costs overall