ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Cut stock, resawing lumber, and planing
SIC 2+ Digits Required
3+ Characters Required for Products

35

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $938k 242k
MMBtu
$6.57
- Electrical $556k 11,560k
kWh
$0.078
- Natural Gas $164k 25k
MMBtu
$2.58

243

Recommendations

6.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $88k 11k
MMBtu
4.6%
- Electrical $50k 1,076k
kWh
9.3%
- Natural Gas $13k -
MMBtu
-
Waste $0.7k
Productivity/Other $62k
TOTAL $151k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $938k 242k
MMBtu
$6.57
- Electrical $556k 11,560k
kWh
$0.078
- Natural Gas $164k 25k
MMBtu
$2.58

125

Implemented Recommendations

3.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $42k 2.7k
MMBtu
1.1%
- Electrical $14k 268k
kWh
2.3%
- Natural Gas $16k -
MMBtu
-
Waste $0.3k
Productivity/Other $8.2k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall