ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Millwork
SIC 2+ Digits Required
3+ Characters Required for Products

130

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $778k 153k
MMBtu
$8.14
- Electrical $444k 8,811k
kWh
$0.064
- Natural Gas $109k 16k
MMBtu
$5.21

977

Recommendations

7.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $96k 11k
MMBtu
7.1%
- Electrical $55k 1,056k
kWh
12.0%
- Natural Gas $16k -
MMBtu
-
Waste $1.4k
Productivity/Other $63k
TOTAL $161k
*May be negative reflecting an increased cost component required to save energy and costs overall

126

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $773k 155k
MMBtu
$8.09
- Electrical $440k 8,852k
kWh
$0.064
- Natural Gas $106k 16k
MMBtu
$5.06

413

Implemented Recommendations

3.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $35k 3.0k
MMBtu
1.9%
- Electrical $16k 288k
kWh
3.3%
- Natural Gas $8.8k -
MMBtu
-
Waste $0.4k
Productivity/Other $16k
TOTAL $51k
*May be negative reflecting an increased cost component required to save energy and costs overall