ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other wood product manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

217

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $731k 136k
MMBtu
$9.13
- Electrical $398k 7,529k
kWh
$0.073
- Natural Gas $131k 22k
MMBtu
$5.15

1,563

Recommendations

7.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $91k 10k
MMBtu
7.6%
- Electrical $57k 1,005k
kWh
13.4%
- Natural Gas $9.8k -
MMBtu
-
Waste $1.9k
Productivity/Other $54k
TOTAL $147k
*May be negative reflecting an increased cost component required to save energy and costs overall

206

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $744k 141k
MMBtu
$8.93
- Electrical $405k 7,733k
kWh
$0.073
- Natural Gas $133k 22k
MMBtu
$5.09

694

Implemented Recommendations

3.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 4.7k
MMBtu
3.3%
- Electrical $28k 454k
kWh
5.9%
- Natural Gas $5.8k -
MMBtu
-
Waste $0.3k
Productivity/Other $14k
TOTAL $57k
*May be negative reflecting an increased cost component required to save energy and costs overall