Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Truss manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

8

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $140k 13k
MMBtu
$9.99
- Electrical $56k 981k
kWh
$0.062
- Natural Gas $12k 1.4k
MMBtu
$6.07

49

Recommendations

6.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $22k 1.0k
MMBtu
8.1%
- Electrical $9.2k 102k
kWh
10.4%
- Natural Gas $1.7k -
MMBtu
-
Waste $0.2k
Productivity/Other $67k
TOTAL $89k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $140k 13k
MMBtu
$9.99
- Electrical $56k 981k
kWh
$0.062
- Natural Gas $12k 1.4k
MMBtu
$6.07

21

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $6.5k 0.4k
MMBtu
3.3%
- Electrical $4.5k 42k
kWh
4.3%
- Natural Gas $0.1k -
MMBtu
-
Waste -
Productivity/Other $24k
TOTAL $30k