ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Engineered wood member (except truss) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products

7

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $807k 134k
MMBtu
$7.44
- Electrical $345k 7,455k
kWh
$0.047
- Natural Gas $235k 52k
MMBtu
$4.85

41

Recommendations

5.9

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 6.4k
MMBtu
4.8%
- Electrical $30k 624k
kWh
8.4%
- Natural Gas $0.6k -
MMBtu
-
Waste -
Productivity/Other $13k
TOTAL $56k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $807k 134k
MMBtu
$7.44
- Electrical $345k 7,455k
kWh
$0.047
- Natural Gas $235k 52k
MMBtu
$4.85

16

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $12k 1.9k
MMBtu
1.4%
- Electrical $8.0k 186k
kWh
2.5%
- Natural Gas $3.1k -
MMBtu
-
Waste -
Productivity/Other $8.6k
TOTAL $20k
*May be negative reflecting an increased cost component required to save energy and costs overall